题目内容

【题目】每年4~6月,我国新疆阿勒泰地区的河流常常发生洪水灾害,其特征为“一日一汛”,即白天河流流量很大,夜晚则洪峰消退。据此完成下列各题。

【1】此类洪水的直接补给水源主要是( )

A.大气降水 B.高山冰川融水 C.季节性积雪融水 D.湖泊水

【2】“一日一汛”反映了当地( )

A.冰雪融化迅速 B.昼夜温差大 C.降水变率很大 D.自然灾害频繁

【答案】

【1】C

【2】B

【解析】

试题分析:

【1】新疆位于我国西北内陆,降水少,河流补给水源以冰雪融水补给为主,4-6月,气温较低,海拔较低的季节性积雪融化,是河流的主要补给水源,夏季气温升高,季节性积雪融化完,高山冰川融水补给为主,冰雪融化受气温影响。

【2】“一日一汛”说明白天积雪融化多,河流水量大,夜晚融化少,河流水量小,说明昼夜温差大,“一日一汛”反映的是水量变化,不是灾害多少。

练习册系列答案
相关题目

【题目】A

The forces that make Japan one of the world’s most earthquakeprone (有地震倾向的) countries could become part of its longterm energy solution.

Water from deep below the ground at Japan’s tens of thousands of hot springs could be used to produce electricity.

Although Japanese hightech companies are leaders in geothermal (地热的) technology and export it,its use is limited in the nation.

“Japan should no doubt make use of its resources of geothermal energy,” said Yoshiyasu Takefuji,a leading researcher of thermalelectric power production.

The disastrous earthquake and tsunami on March 11,2011 caused a reaction against atomic power,which previously made up 30 percent of Japan’s energy needs,and increased interest in alternative energies,which accounted for only 8 percent.

Artist Yoko Ono has called on Japan to explore its natural energy,following the example of Iceland which uses renewable energy for more than 80 percent of its needs.

For now,geothermal energy makes up less than 1 percent of the energy needs in Japan,which has for decades relied heavily on fossil fuels and atomic power.

The biggest problem to geothermal energy is the high initial cost of the exploration and constructing the factories.Another problem is that Japan’s potentially best sites are already being developed for tourism or are located within national parks where construction is forbidden.

“We can’t even dig 10 cm inside national parks.” said Shigeto Yamada of Fuji Electric,adding that regulations protecting nature would need to be relaxed for geothermal energy to grow.

Researcher Hideaki Matsui said,“Producing electricity using hot springs is a decadeslong project.We also have to think about what to do for now as energy supplies will decline in the short term.”

The Earth Policy Institute in Washington,US,believed Japan could produce 80 000 megawatts (兆瓦) and meet more than half its electricity needs with geothermal technology.

Japanese giants such as Toshiba are already global leaders in geothermal technology,with a 70 percent market share.In 2010,Fuji Electric built the world’s largest geothermal factory in New Zealand.

【1】What would be the best title for the text?

A.Alternative energies in Japan

B.World’s largest geothermal plant

C.Japan takes the lead in geothermal technology

D.Japan thinks of geothermal energy

【2】What percentage of Japan’s energy needs is geothermal energy?

A.About 8%. B.Below 1%.

C.Around 30%. D.Over 80%.

【3】According to Shigeto Yamada,the growth of geothermal power in Japan needs________.

A.a change of rules B.financial support

C.local people’s help D.high technology

【4】It can be learned from the last two paragraphs that________.

A.the world’s biggest geothermal plant was built by America

B.Japan will not export its geothermal technology

C.the potential of Japan’s geothermal energy is great

D.it is hard to find geothermal energy in Japan

违法和不良信息举报电话:027-86699610 举报邮箱:58377363@163.com

精英家教网