题目内容
【题目】
That Beijing with Zhangjiakou succeeded in getting the chance to host the 2022 Winter Olympic Games, speeds up the development of Zhangjiakou City.【1】is reported, the Beijing-Zhangjiakou high-speed railway【2】(locate) in North China, is being built now. It【3】(expect) to be completed by 2020 in preparation for the 2022 Winter Olympics. The project is a big challenge,【4】designers say they will find ways to solve problems. The line has a【5】(long) of 174 km as a double tracked passenger line, with ten stations along its route. Having a【6】totally) investment of 31.17 billion yuan, the trip between the two cities will only take 40 minutes, with the train【7】(travel) at an average of 250 km/h. The high-speed railway will build two branch lines—one is to Yanqing Station and the other【8】 Taizicheng of Chongli,【9】the Olympic village lies. The full railway, which includes 70-kilometer section through Beijing, will be completed in four and【10】 half years.
【答案】
【1】As
【2】located
【3】is expected
【4】but
【5】length
【6】total
【7】travel(l)ing
【8】to
【9】where
【10】a
【解析】文章主要介绍了即将承办2022年冬季奥运会的张家口的准备工作。
【1】此处为非限定性定语从句,译为正如报道的那样,故用as。
【2】此处为过去分词作定语,修饰railway,…be located in , 与所修饰词为被动关系,所以用过去分词。
【3】此处在句中作谓语,表示有望被完成,所以用被动语态。
【4】根据语境可知,虽然是个挑战,但设计师说会想办法解决。所以表示转折关系。
【5】Has a length of 174,表示有多长
【6】此处修饰investment ,名词前用形容词。
【7】此处考查with的复合结构,the train 与travel 是主动关系,所以用现在分词。
【8】与前面的结构并列,one is to …, and the other to…
【9】定语从句,先行词Taizicheng of Chongli,表地点,所以用关系副词where。
【10】In four and a half years表示四年半。