网址:http://m.1010jiajiao.com/timu_id_2450719[举报]
pay/spend/cost/charge选词填空。
1)If you decide to buy the shirt and skirt together, you will have to ________ 580 dollars.
2)They ________ all the money buying the new house.
3)The salesgirl ________ me
60 for the shirt, which I think was too dear.
4)The expensive car ________ the young couple more than two hundred thousand yuan.
5)Careless driving ________ him his life.
6)The migrant workers are usually ________ by the season.
— How much will it ________ my father and me to go to Chicago?
— It’s 120 in all.
A. pay for B. take as
C. spend D. cost for
查看习题详情和答案>>-How much did your computer ________?
-It ________ me eight thousand yuan.
cost;cost
spend;took
take;spent
pay;cost
完形填空
Building a house costs quite a lot of money. (1) you plan to build a house. Your first (2) will be to find a right piece of land. Your choice will depend on many different things. You will probably try to (3) a sunny place, with (4) surroundings near shops and bus stops, not too far from your friends and the place where you work.
Next you will find an excellent (5) , and together with the builder you will work out a (6) . The builder will draw the plan. It will (7) the number of rooms, their position and size, and other parts which must be noticed, (8) windows, doors and electric outlets. The builder will work out (9) is needed to (10) your house. He will (11) the cost of the wood, bricks, the glass, and (12) else that must be used in building the house. Later on, when he starts to build, this estimate (预算) must be corrected and revised. His estimate is based on existing (13) , but prices of such things may (14) , and many other things may happen (15) the time when he makes the estimate and the time when he builds the house.
When the builder gives his estimate, you may wish to (16) your plan. (You may also wish to change your builder, if his estimate is too (17) !) You may find that some of the features you wanted at first (18) too much, or that you can spend a little more and (19) something to your plan. The builder's estimate depends on the plan, (20) the final plan depends on the builder's estimate.
(1)
[ ]
|
A.Think |
B.Expect |
|
C.Suppose |
D.Decide |
(2)
[ ]
|
A.step |
B.method |
C.way |
D.class |
(3)
[ ]
|
A.find |
B.look |
|
C.discover |
D.uncover |
(4)
[ ]
|
A.happy |
B.pleasant |
|
C.lonely |
D.pleased |
(5)
[ ]
|
A.builder |
B.worker |
|
C.secretary |
D.father |
(6)
[ ]
|
A.cost |
B.plan |
C.map |
D.problem |
(7)
[ ]
|
A.show |
B.draw |
C.see |
D.appear |
(8)
[ ]
|
A.such as |
B.for example |
|
C.that |
D.which |
(9)
[ ]
A.how many builders
B.how much money
C.the days
D.the bricks
(10)
[ ]
|
A.give |
B.sell |
C.build |
D.buy |
(11)
[ ]
|
A.work out |
B.depend on |
|
C.take away |
D.put up |
(12)
[ ]
|
A.something |
B.nothing |
|
C.everything |
D.other thing |
(13)
[ ]
|
A.things |
B.plan |
C.goods |
D.price |
(14)
[ ]
|
A.rise |
B.reduce |
|
C.increase |
D.change |
(15)
[ ]
|
A.in |
B.between |
C.among |
D.by |
(16)
[ ]
|
A.give up |
B.turn off |
|
C.change |
D.put off |
(17)
[ ]
|
A.low |
B.high |
C.fine |
D.cheap |
(18)
[ ]
|
A.cost |
B.pay |
C.spend |
D.takes |
(19)
[ ]
|
A.reduce |
B.place |
C.add |
D.lay |
(20)
[ ]
|
A.and |
B.so |
C.but |
D.then |