Experts have put forward detailed plans for a tunnel (隧道) to join Taiwan with the Chinese mainland.
The shortest proposed(建议) route would be 126 kilometers-more than twice the length of the English Channel Tunnel. And the longest proposed route would be 207 kilometers.
A recent conference in
There is no direct passenger access between the mainland and
A professor of Tsinghua university said, “A special feature of huge projects is that the period of preparation is longer than the period of construction.”
For example, he said, the English Channel Tunnel took 14 years of planning and had been discussed for two centuries. And preparations for the huge Three Gorges dam on the Yangtze River began in the 1950s.
The Xiamen conference focused on the longest southern route, which would use the Taiwan-controlled islands of Jinmen and Penghu as stepping stones.
The first stage of the new project could be a bridge to cross the five kilometers between Xiamen and Jinmen. This would mean that travelling from Xiamen to Jinmen by car would only take five minutes.
The longest tunnel now being planned anywhere in the world is the 54-kilometer Land tunnel to link Lyon in
49.Which is the longest tunnel in the world at present?
A.The English Channel Tunnel. B.The tunnel between Lyon and
C.The Taiwan Straits tunnel. D.The passage doesn't mention it.
50.The example of English Channel Tunnel shows _______.
A.it’s not easy to complete a huge project
B.there are many problems to be solved before doing something
C.discussions among countries usually take a lot of time
D.the preparation takes longer time than the construction
51.Which of the following is NOT true?
A.Universities both at home and abroad have sponsored (赞助) the plan.
B.If the project is completed, the world's longest tunnel will appear.
C.You can’t reach
D.The starting point of the proposed tunnel is in
52.What is the possible difficulty in carrying out the plan?
A.The lack of money for the project from the government.
B.Improving the relationship between
C.The detailed plans for the tunnel.
D.The technical problems with the tunnel.