题目内容

【题目】

INTRODUCTION

The Omron HEM-780 IntelliSenseTM Automatic Blood Pressure Monitor quickly measures your blood pressure and your measurement reading can be clearly displayed on a large digital panel.

KNOW YOUR UNIT

IMPORTANT SAFETY NOTES

* Do not use a cell phone near the unit, which may result in operational failure.

* Changes or modifications not approved by Omron Healthcare will declare the user warranty invalid. Do not disassemble or attempt to repair the unit or components.

SUGGESTIONS BEFORE TAKING

1. Avoid eating, smoking, and exercising for 30 minutes before taking a measurement. Rest for at least 15 minutes before taking the measurement.

2. Stress raises blood pressure. Avoid taking measurements during stressful times.

3. Rest your left arm on a table so that the cuff is at the same level as your heart.

4. Wait 2-3 minutes between measurements. The wait time allows the arteries (动脉) to return to the condition prior to taking the blood pressure measurement.

WARRANTY INFORMATION

Your HEM-780 IntelliSenseTM Automatic Blood Pressure Monitor is guaranteed to be free from faults in materials and workmanship appearing within 5 years, when used in accordance with the instructions provided with the monitor. The above warranties extend only to the original retail purchaser. To obtain warranty service, ship the monitor and all of the components, together with proof of purchase and a note explaining the problem with $5.00 for return shipping and insurance to:

Omron Healthcare, Inc.

Attn: Repair Department

300 Lakeview Parkway

Vernon Hills, IL 60061

1Your measure reading might be inaccurate, if ________.

a. you have just finished your meal

b. you have just cycled home from work

c. your child is using the cell phone in the next room

d. your wife has just finished measuring her blood pressure

e. you have just been scolded by your boss because of the delayed work

A. a b c B. a b e C. b c e D. c d e

2Which of the following monitors is under warranty?

A. The monitor that was bought six years ago.

B. The monitor that goes wrong due to false use.

C. The monitor whose purchase proof is missing.

D. The monitor whose system broke down when first used.

【答案】

1B

2D

【解析】

这是一篇应用文,这是欧姆龙血压计的一个说明书以及售后服务等。

1细节理解题。根据SUGGESTIONS BEFORE TAKING这一部分中的Avoid eating, smoking, and exercising for 30 minutes before taking a measurement.以及Stress raises blood pressure. Avoid taking measurements during stressful times.可知,在测量前30分钟要避免吃东西和运动,也要避免压力。因此a, b, e这三个选项所提到的事情会影响血压的精确。故选B。

2细节理解题。根据表格中最后一部分的信息可知,如果按照说明书操作,可以质保5年,期间如果出现问题,需要连同购买证明一起运送会公司。因此可以推断如果第一次使用系统出现问题的话,在保修范围之内。故选D。

练习册系列答案
相关题目

【题目】Beijing Daxing Airport is Finally Open

Beijing Daxing International Airport (PKX), also known as Beijing New Airport, is the biggest airport in the world. It is also the second international airport of Beijing along with Beijing Capital International airport. The airport's design is pioneering while its location on Daxing District (the southern suburbs of Beijing) is perfect in order to serve the Chinese capital and the neighboring areas of Hebei and Tianjin. The new mega-airport hub (大型枢纽机场) is expected to handle up to 45 million passengers per year by 2021 and reach an outstanding 100 million in the future.

How big is Daxing Airport?

The gigantic Daxing Airport, with the impressive shape which has given it the nickname 'Starfish', has enormous dimensions. There are 4 runways at present (with the hope of becoming 7 in the future) and a vast terminal building (航站楼) covering a 700,000m area while the ground transportation centre extends to 80,000m.

How many runways does Daxing Airport have?

For the time being, Daxing Airport has four runways and 79 airport stands. The 4 runways' size is impressive while the airport stands are suitable both for one twin-aisle (双通道) and two single-aisle planes. Eventually, the airport will have 7 runways in total and will be able to serve about 620,000 flights every year.

Who designed Daxing Airport?

Daxing Airport's terminal building is the impressive outcome of the cooperation between ADP Ingeniérie (ADPI) and the architecture team of Zaha Hadid (ZHA) who tragically passed away in 2016. As a result, in August 2018, Hong Kong design studio Lead 8 undertook the design of the new commercial terminal which is expected to meet every passenger's needs.

How much did Daxing Airport cost?

The construction of the mega-airport, which is expected to eventually become the busiest airport in the world, cost an unsurprisingly large amount. The Chinese government is estimated to have paid about US $17.47 billion for this great project.

1Daxing Airport is built _________________.

A.to serve Beijing, Hebei and Tianjin

B.only for the Chinese capital, Beijing

C.as the second biggest airport in the world

D.to handle up to 45 million passengers per year

2What did the Hong Kong design studio Lead 8 undertake?

A.The runways.B.The airport stand.

C.The terminal building.D.The commercial terminal.

3What is the purpose of the passage?

A.To introduce Daxing Airport.

B.To inform how Daxing Airport was built.

C.To attract people to visit Daxing Airport.

D.To discuss importance of Daxing Airport.

【题目】Musicals in Washington’s Historic National Theatre in 2020

The Last Ship

Friday, March 27—Sunday, April 5

$49—$154

THE LAST SHIP, inspired by Sting’s 1991 album The Soul Cages and his own childhood experiences, tells the story of a community in Tyne and Wear.Sting will star and perform the role at every performance. It features an original score with music and lyrics by Sting as well as a few of his best-loved songs: Island of Souls""All This Time and When We Dance. Learn more atTheLastShipMusical.com.

Recommended for ages 13 and up.

Run time: Approximately 2 hours, 30 minutes.

The King’s Speech

Tuesday, Feb. 11 — Sunday, Feb. 16

$54 — $104

THE KING’S SPEECH is based on the true story of King George VI’s struggle with a speech problem and the friendship he formed with his doctor, Lionel Logue. With the Nazi threat coming and civil unrest at home, royal secrets explode around the King as he appeared onto the world stage.

Recommended for ages 13 and up.

Run time: Approximately 2 hours, 50 minutes.

Blue Man Group

Friday, May 8 —Sunday, May 17

$64—$124

At BLUE MAN GROUP, you’ll rock, laugh, and party! As three blue men explore our world, together we’ll discover music, comedy and surprises at every turn. It is perfect for audiences of all ages and cultural backgrounds, and returns to D.C. with new music, fresh stories, custom instruments like never before.

Recommended for ages 4 and up.

Run time: Approximately 1 hour, 30 minutes

Summer: The Donna Summer Musical

Wednesday, July 22 —Sunday, Aug. 2

$54—$114

Donna Summer was a girl from Boston with a voice from heaven. With a score featuring more than 20 of Summer’s classic hits including Love to Love You Baby""Bad Girls and Hot Stuff, this electric experience is a moving tribute to the voice of a generation.

Recommended for ages 13 and up.

Run time: Approximately 1 hour, 40 minutes

1In which musical can you enjoy the song All This Time?

A.The King’s Speech.B.The Last Ship.

C.Blue Man Group.D.Summer: The Donna Summer Musical.

2When is the musical The King’s Speech scheduled to open?

A.Tuesday, Feb. 11.B.Friday, March 27.

C.Sunday, May 17.D.Wednesday, July 22.

3What is the ticket price range of “Summer: The Donna Summer Musical”?

A.$49 — $154.B.$64 — $124.C.$54— $104.D.$54 —$114.

违法和不良信息举报电话:027-86699610 举报邮箱:58377363@163.com

精英家教网