题目内容
【题目】 Hong Kong-Zhuhai-Macao Bridge to form three-hour travel circle. The 55-kilometer bridge in the Lingdingyang waters of the Pearl River Estuary, which was opened in late October 2018, is the world's longest sea bridge. The project follows the logic that China has been using for years to guide economic development - if you want to get rich, first build a road.
At 20 times the length of California's Golden Gate Bridge, the six-lane crossing will link a regional economic zone of 70 million people, with a combined annual GDP of $1.51 trillion--almost twice that of the San Francisco Bay Area, and larger than the national economies of Australia, Spain or Mexico.
The links are part of a plan to create an integrated(综合的) region that officials have dubbed(被称为) the “Greater Bay Area”. The bridge will put Hong Kong, Macao and Zhuhai within an hour of each other. The main bridge, together with crossing facilities and link roads, is designed to meet growing demands for passenger and freight transport between the three cities. A “three-hour tour and golden circle” will be formed thanks to the massive(巨大的) bridge, road networks and rail links to other cities, making more travel itineraries(旅游活动日程)available.
【1】Hong Kong-Zhuhai-Macao Bridge was opened _____________.
A. In early October 2018.B. In late October 2018.
C. In early November 2018.D. In late November 2018.
【2】It is designed to meet growing demands for _____________.
A. passenger transport.B. freight transport.
C. passenger and freight transport.D. goods transport.
【3】Which of the following is TRUE according to the passage?
A. The seven-lane crossing will link a reginal economic zone of 70 million people.
B. The annual GDP of the economies of Australia, Spain or Mexico are larger than that of the regional economic zone in China.
C. The bridge will put Hong Kong, Macao and Zhuhai within an hour of each other.
D. A “three-hour tour and golden circle” will be formed just thanks to the massive bridge, road networks .
【答案】
【1】B
【2】C
【3】C
【解析】
文章大意:文章介绍了港珠澳大桥开通了,介绍了其建筑和设计,及其重要作用等。
【1】细节理解题。根据The 55-kilometer bridge in the Lingdingyang waters of the Pearl River Estuary, which was opened in late October 2018,珠江口伶仃洋55公里大桥于2018年10月下旬通车,可知,香港珠海澳门大桥于2018年10月下旬开通。故选B。
【2】细节理解题。根据The main bridge, together with crossing facilities and link roads, is designed to meet growing demands for passenger and freight transport between the three cities. 主桥与交叉设施和连接道路一起,旨在满足三个城市之间日益增长的客货运输需求。可知,它旨在满足日益增长的客货运输需求。故选C。
【3】细节理解题。根据The bridge will put Hong Kong, Macao and Zhuhai within an hour of each other. 这座桥将使香港、澳门和珠海相隔一小时。可知,根据这段话,大桥将把香港、澳门和珠海放在一小时之内。是正确的,故选C。
阅读理解一般考查学生的细节理解能力、主旨理解能力和推理判断能力。做阅读理解题,首先要准确理解题意,然后根据题意和短文内容选出正确的答案。(1)考查细节理解能力,此类型题较简单,学生准确理解题意后,直接到文中找出答案。(2)考查猜词能力。做这种题型时,学生要根据上下文意思准确猜出词义。3)考查推理判断能力,此类题型较难,学生要准确理解题意后,在文中找出相关的内容做出合理的推断。本文主要 考查学生的细节理解能力。准确理解题意后,到文中找出相关的叙述,做出正确的判断。