摘要:75.The passage is mainly about . A.the construction of a road B.the design of a road C.the construction of two tunnels D.the design of two tunnels 答案 72.D 73.C 74.B 75.D Passage 65 It’s2035. You have a job, a family and you’re about 40 years old welcome to your future life. Getting ready for work, you pause in front of the mirror. “Turn red, you say. Your shirt changes from sky blue to deep red. Tiny preprogrammed electronics are rearranged in your shirt to change its color. Looking into the mirror, you find it hard to believe you’re 40. You look much younger. With amazing advances in medicine, people in your generation may live to be 150 years old. You’re not even middle – aged ! As you go into the kitchen and prepare to pour your breakfast cereal into a bowl, you bear, “To lose weight, you shouldn’t eat that , from your shoes. They read the tiny electronic on the cereal box to find out the nutrition details. You decide to listen to your shoes. “Kitchen, what can I have for breakfast? A list of possible foods appears on the counter as the kitchen checks its food supplies. “Ready for your trip to space ? you ask your son and daughter. In 2005 only specially trained astronauts went into space – and very few of them. Today anyone can go to space for day trips or longer vacations. Your best friend even works in space. Handing your children three strawberries each, you “The doctor said you need these for space travel Thanks to medical advances, vaccination shots are a thing of the past. Ordinary foods contain specific vaccines. With the berries in their mouths, the kids bead for the front door. It’s time for you to go to work. Your car checks your fingerprints and unlocks the doors “My office. Autopilot, you command. Your car drives itself down the road and moves smoothly into traffic on the highway. You sit back and unroll your e – newspaper. The latest news down loads and fills the viewer. Looking through the pages you watch the news as video film rather than read it.

网址:http://m.1010jiajiao.com/timu3_id_2541473[举报]

阅读理解

  A new eight-kilometer road is under construction that links the port area with motorway system. It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city. As part of the project, two four-kilometer road tunnels are being built below the central area of the city, one for traffic to the north and the other for the traffic to the south. The two tunnels are about 20 meters below the surface and are 12 meters wide, providing for two lanes of traffic in each direction.

  In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel. The lighting is at the top of the tunnel, practically at its highest point. There will also be electric signs at frequent intervals. They show traffic conditions ahead and can be seen clearly by drivers. The wall is made up of four main elements, which include a waterproofing covering and, on the inside of the tunnel, a concrete lining.

  Each tunnel is roughly round and the lower part of the tunnel is somewhat flat. The surface of the road lies on the base, which is made of concrete and steel. The drainage system, just below the road surface on one side, removes any extra liquid, particularly water. In the event of fire, the fire main, which is made of steel, pipes water to many fire hydrant stations at regular intervals along the length of the tunnel. The fire main is at the side of the tunnel and at the level of the road surface. Other systems in the tunnel will include emergency phones.

(1)

Each of the tunnels under construction is ________.

[  ]

A.

eight kilometers long and twenty meters wide

B.

eight kilometers long and six meters wide

C.

four kilometers long and twenty meters wide

D.

four kilometers long and six meters wide

(2)

Which part of the tunnel in the diagram is used to pipe out extra water?

[  ]

A.

1

B.

3

C.

5

D.

6

(3)

Driving in the tunnel, one can know the traffic conditions ahead through________.

[  ]

A.

the lights

B.

the electric signs

C.

the trucks and the cars

D.

the emergency phones

(4)

The passage is mainly about ________.

[  ]

A.

the construction of a road

B.

the design of a road

C.

the construction of two tunnels

D.

the design of two tunnels

查看习题详情和答案>>

 (06·江苏E篇)

A new eight-kilometre road is under construction that links the port area with the motorway system . It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city . As part of the project , two four-kilometre road tunnels are being built below the central area of the city , one for traffic to the north and the other for traffic to the south .The two tunnels are about 20 metres below the surface and are 12 metres wide , providing for two lanes of traffic in each direction .

In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel . The lighting is at the top of the tunnel , practically at its highest point . There will also be electronic signs at frequent intervals (间隔). They show traffic conditions ahead , and can be seen clearly by drivers . The wall is made up of four main elements , which include a waterproofing covering and , on the inside of the tunnel , a concrete lining (混凝土衬砌).

Each tunnel is roughly round and the lower part of the tunnel is somewhat flat .The surface of the road lies on the base , which is made of concrete and steel  The drainage system (排水系统), just below the road surface on one side , removes any extra liquid , particularly water . In the event of fire , the fire main , which is made of steel , pipes water to many fire hydrant stations at regular intervals along the length of the tunnel . The fire main is at the side of the tunnel , and at the level of the road surface . Other systems in the tunnel will include emergency phones .

72.Each of the tunnels under construction is       .

       A.eight kilometers long and twenty metres wide

       B.eight kilometers long and six metres wide

       C.four kilometers long and twenty metres wide

       D.four kilometers long and six metres wide

73.Which part of the tunnel in the diagram is used to pipe out extra water ?

       A.1.                           B.3.                           C.5.                           D.6.

74.Driving in the tunnel , one can know the traffic conditions ahead through        .

       A.the lights                                                   B.the electronic signs

       C.the trucks and cars                                    D.the emergency phones

75.The passage is mainly about        .

       A.the construction of a road                           B.the design of a road

       C.the construction of two tunnels                   D.the design of two tunnels