题目内容
_________ 202 km Shanghai-Hangzhou high-speed railway, with _________ design speed of 350 km per hour, began its operation on Oct 26, 2010.
[ ]
A.The; a
B.The; the
C.A; a
D.A; the
答案:A
![](http://thumb.zyjl.cn/images/loading.gif)
练习册系列答案
相关题目
202 km Shanghai—Hangzhou high-speed railway, with deign speed of 350 km per hour, began its operation on Oct 26,2010.
A.The; a | B.The; the | C.A; a | D.A; the |